103 Colmore Row, Birmingham, UK - A Gem of a building!

103 Colmore Row in Birmingham is a 223,631 sq ft office tower, with 7,665 sq ft of restaurant space on the ground and top floors. Take our feature for the story of this impressive build.


103 Colmore Row

Birmingham 

B3 3AG

View site map HERE.

Photography by Daniel Sturley

 

Developer: Sterling Property Ventures

Architect: Doone Silver Kerr

Contractor: BAM

Enquiries: Knight Frank; Cushman & Wakefield; or Colliers International

 

In brief

At 108 metres tall. 103 Colmore Row, at the time of approval, was recorded as the largest new office building to be constructed outside London. It is most definitely one of Birmingham's modern architectural gems.

Following the demolition of the previous building and preparation of the new site, construction of 103 Colmore Row began in January 2016 and the exterior of the build was completed in November/December 2020. 

The developer is Sterling Property Ventures, the building contractor is BAM and the architect is Doone Silver Kerr. 103 Colmore Row is due to open in 2021. 

Artists impression of the final build credited to Doone Silver Kerr Architects.

 

From the same viewpoint, 5th April 2021. Photography by Daniel Sturley

103 Colmore Row latest photo, 22nd November 2021:

Photography by Daniel Sturley

Contained as part of this feature and accessible in the gallery are over 1,600 photos of the construction of 103 Colmore Row. Alternatively connect via 103 Colmore Row Full Construction Photo Gallery.

 

The story of the build

Developers Sterling Ventures submitted and received approval to build this new office tower on the land at that time occupied by the Natwest Tower.  At 108 metres tall, it would be the tallest office to be built in Birmingham, and the tallest, at that time, to be built in the UK outside of London.   

Artists impression of the final build credited to Doone Silver Kerr Architects.

 

Artists impression of the planned 7,665 sq ft restaurant credited to Doone Silver Kerr Architects.

 

The site was previously occupied by a building named the Natwest Tower.

The Natwest Tower, Birmingham (2014).  Photography by Daniel Sturley

 

The Natwest Tower launches a rainbow in a vain attempt to stay its' demise.  Photography by Daniel Sturley

 

January 2016

Demolition work commenced in late 2015 through early 2016.

Demolition of the Natwest Tower in September 2015.  Photography by Elliott Brown.

 

Demolition of the Natwest Tower in October 2015.  Photography by Elliott Brown.

 

Demolition of the Natwest Tower in January 2016.  Photography by Daniel Sturley.

 

Demolition of the Natwest Tower in February 2016. Photography by Daniel Sturley

 

Demolition of the Natwest Tower in March 2016. Photography by Daniel Sturley.

 

Site cleared for 103 Colmore Row, Birmingham.  Photography by Daniel Sturley.

 

November 2016

In November 2016, the site is cleared and was a big hole for a while.

Site cleared for 103 Colmore Row, Birmingham.  Photography by Daniel Sturley.

 

Site cleared for 103 Colmore Row, Birmingham.  Photography by Daniel Sturley

 

January 2018

In January 2018, the site remains a big hole.

Site cleared for 103 Colmore Row, Birmingham.  Photography by Daniel Sturley

 

May 2018

In May 2018, site preparation commences for the construction of 103 Colmore Row and by January/February 2019 foundations and the structure of the basement is well underway.

The view from Victoria Square in February 2019.  Photography by Elliott Brown

 

The site just before the core rises in May 2019. Photography by Stephen Giles

 

July 2019

By July 2019, significant progress has been made to the core of the building.

103 Colmore Row, Birmingham. Photography by Daniel Sturley

 

By the end of July 2019, the core reaches the 10th floor but is still not visible from Victoria Square.

Construction of 103 Colmore Row, Birmingham.  Photography by Daniel Sturley

 

Into August 2019, 103 Colmore Row can be seen rising from prime locations across the city.

Construction of 103 Colmore Row.  Photography by Alan Webb.

 

Construction of 103 Colmore Row, Birmingham.  Photography by Elliott Brown

 

September 2019

By September 2019, the prominence and size of this building really was becoming apparent. 

September 2019, now its getting big. Photography by Daniel Sturley

 

September 2019, with the 22 floor main core complete a 'min-core'  up to the 26th floor is added. Photography by Daniel Sturley

 

September 2019, the overrun concrete is removed. Photography by Daniel Sturley

 

See more photography taken at this time of the build in the It's Your Build 19th September Update Post

In September 2019, the second crane is installed on the 22nd floor main core with huge base weights.

Second crane is installed. Photography by Daniel Sturley

 

October 2019

October 2019 sees the start of the steel structure.

Start of the steel structure. Photography by Daniel Sturley

 

In November, the detail of the architecture can be seen from Newhall Street.

View from Newhall Street. Photography by Daniel Sturley

 

Massive steel supports for the Colmore Row set-back are installed.

Colmore Row set-back are installed. Photography by Daniel Sturley

 

103 Colmore Row next to the BT Tower!. Photography by Tom Grunt

 

New view from Victoria Square. Photography by Daniel Sturley

 

November 2019

By November 2019, the set-back structure is almost complete and the main crane is extended.

Set-back structure almost complete. Photography by Daniel Sturley

 

Main crane is extended and further tied to the core. Photography by Daniel Sturley

 

First floor slab of the main rise is completed over the set-back on Colmore Row. Photography by Daniel Sturley

December 2019

This huge structure teases us with great views across the city with more lower floors on the rise.

View from Centenary Way. Photography by Daniel Sturley

 

More lower floors on the rise. Photography by Daniel Sturley

 

View from Deritend. Photography by Stephen Giles

 

View from Ladywood. Photography by Stephen Giles

 

View from the Jewellery Quarter. Photography by Stephen Giles

 

January 2020

The huge mass of 103 Colmore Row really apparent as we move in to 2020. 

Starting to show it's full mass. Photography by Daniel Sturley

 

Bright construction lighting in the late afternoon. Photography by Reiss Gordon-Henry

 

February 2020

Fenruary 2020 sees the steel structure imposing itself and the start of the external cladding and glazing.

Steel structure imposing itself. Photography by Daniel Sturley

 

First of the cladding to be installed. Photography by Daniel Sturley

 

First reflection photo opportunity. Photography by Daniel Sturley

 

View from Great Charle Street. Photography by Alan Webb

 

View from Suffolk Street Queensway. Photography by Stephen Giles

 

View from the back of Grand Central (March 2020). Photography by Reiss Gordon-Henry

 

Cladding and the set-back giving more of a feel for the building's presence on Colmore Row (April 2020). Photography by Daniel Sturley

 

As reflected in Two Chamberlain Square (April 2020). Photography by Daniel Sturley

 

More cladding and glazing installed (May 2020). Photography by Reiss Gordon-Henry

 

View from Victoria Square (May 2020). Photography by Daniel Sturley

 

View from near the Bristol Road (June 2020). Photography by Daniel Sturley

 

View from Edgbaston Reservoir (June 2020). Photography by Elliott Brown

 

View from Margaret Street (June 2020). Photography by Reiss Gordon-Henry

 

The first main crane is removed (June 2020). Photography by Daniel Sturley

July 2020

103 Colmire Row now close to being topped out.  

Getting very close to structural top-out (July 2020) as seen from Castle Bromwich. Photography by Elliott Brown

 

Structural top-out in July 2020 Photography by Elliott Brown

 

Cladding and glazing chasing up fast. (July 2020). Photography by Stephen Giles

 

View from Digbeth (August 2020). Photography by Elliott Brown

 

103 Colmore Row and the Museum and Art Gallery (August 2020). Photography by Daniel Sturley

September 2020

September 2020 and we see the completion of the external glazing.

The glass facade on Colmore Row is complete (September 2020). Photography by Daniel Sturley

 

103 Colmore Row and the Birmingham City Council House in Victoria Square (October 2020). Photography by Daniel Sturley

 

103 Colmore Row from Cathedral Square at night (November 2020). Photography by Stephen Giles

 

103 Colmore Row almost fully clad (November 2020). Photography by Daniel Sturley

December 2020 

Into December 2020 and the remaining crane is taken down.

103 Colmore Row (December 2020). Photography by Daniel Sturley

 

The remaining crane is taken down (December 2020). Photography by Daniel Sturley

New Years Eve 2020

Superb spectacle over 103 Colmore Row as Laser passes over the completed external build. 

The New Year Rainbow Laser passes 103 Colmore Row (31st December 2020). Photography by Daniel Sturley

 

View from Tysley Station (2nd February 2021). Photography by Elliott Brown

 

The fog hides the top of 103 Colmore Row (6th Februar 2021). Photography by Daniel Sturley

7th March 2021, 103 Colmore Row from Suffolk Street Queensway near the Mailbox.  Photography by Daniel Sturley

16th March 2021, 103 Colmore Row from Victoria Square.  Photography by Daniel Sturley

22nd March 2021, 103 Colmore Row at sunset.  Photography by Daniel Sturley

26th March 2021, Installation of the bolcony parapet glass.  Photography by Daniel Sturley

1st April 2021, 103 Colmore Row from Victoria Square.  Photography by Daniel Sturley

7th April 2021, 103 Colmore Row just before sunset.  Photography by Daniel Sturley

24th April 2021, 103 Colmore Row The day after St George's Day in Victoria Square.  Photography by Elliott Brown

3rd April 2021, 103 Colmore Row.  Photography by Daniel Sturley

17th April 2021, 103 Colmore Row with a partial rainbow.

Photography by Daniel Sturley

21st October 2021, with the City Council House Dome.

Photography by Daniel Sturley

7th November 2021, with the festive tree in Victoria Square.

Photography by Daniel Sturley

Latest photo, 22nd November 2021, reflecting a sunset sky.

Photography by Daniel Sturley

To be continued .....

Project dates

29 Jul 2018 - On-going

Passions

Construction & regeneration, Modern Architecture

Contact

Your Place Your Space

Jonathan Bostock

0121 410 5520
jonathan.bostock@ yourplaceyourspace.com

Related posts

Construction & regeneration
01 Apr 2019 - Your Place Your Space
Introducing

Introducing 103 Colmore Row, Birmingham, UK

Post image

Take the post for full details of 103 Colmore Row, Birmingham, UK. 

Related

Introducing 103 Colmore Row, Birmingham, UK





Take the post for full details of 103 Colmore Row, Birmingham, UK. 


PROJECT DETAIL:

26 floor office tower, with 7,665 sq ft of restaurant space on the ground and top floors. At the time of approval, the structure at 108m tall is the largest new office under construction outside London. 

DEVELOPER:

Sterling Property Ventures

PARTNERS:

Tristan Capital Partners

ARCHITECTS:

Doone Silver Kerr Architects 

CONTRACTOR:

BAM Construction 

PLANNING APPLICATION: 

2015/04428/PA (Full Planning)
2015/04465/PA (Full Planning Demolition)
2017/10647/PA (Variation of Condition)
2019/02175/PA (Non Material Amendment)
(https://bit.ly/2qQZ32O)

TARGETED COMPLETION:

January 2021

IMAGES BY Doone Silver Kerr Architects:

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 5.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 4.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 3.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 2.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 1.jpg" style="width: 100%;" />

Share  Connect with us
60 passion points
Construction & regeneration
28 Dec 2021 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - December 2021

Post image

The construction of 103 Colmore has moved on to external finishing touches including the new recessed plaza on Colmore Row and the installation of the 'Equinox' sculpture by John Pickering. Photos covering most of November and December in this gallery including a great rainbow on the 7th December (above). Photography coutesy Daniel Sturley and Elliott Brown.

Related

The Construction of 103 Colmore Row - December 2021





The construction of 103 Colmore has moved on to external finishing touches including the new recessed plaza on Colmore Row and the installation of the 'Equinox' sculpture by John Pickering. Photos covering most of November and December in this gallery including a great rainbow on the 7th December (above). Photography coutesy Daniel Sturley and Elliott Brown.


7th November

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_2618b_103CR.jpg" />

Photography by Daniel Sturley.

17th November

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_2719b_103CR.jpg" />

Photography by Daniel Sturley.

20th November

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3464b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3483b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3493b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3500b_103CR_002.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3507b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3508b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3517b_103CR.jpg" />

Photography by Daniel Sturley.

22nd November

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_4191b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_4231b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_4235b_103CR.jpg" />

Photography by Daniel Sturley.

26th November

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_4926b_103CR.jpg" />

Photography by Daniel Sturley.

27th November, the installation of the 'Equinox' sculpture by John Pickering.

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Equinox%20103%20Colmore%20Row%2027112021%20(1).JPG" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Equinox%20103%20Colmore%20Row%2027112021%20(2).JPG" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Equinox%20103%20Colmore%20Row%2027112021%20(3).JPG" />

Photography by Elliott Brown.

1st December

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/HOF%20Christmas%20Cathedral%20Sq%2001122021%20(1).JPG" />

4th December

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Rot%20103%20CR%20BT%20Twr%20Selfridges%20Tyseley%2004122021.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Beetham%20Rotunda%20103%20CR%20Tyseley%20TMD%2004122021.jpg" />

Photography by Elliott Brown.

4th December

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5674b_103CR.jpg" />

Photography by Daniel Sturley.

7th December

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5958b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5993b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6075b_RNBW.jpg" />

Photography by Daniel Sturley.

12th December

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20CR%20BFCM%20Xmas%20tree%2012122021.jpg" />

Photography by Elliott Brown.

19th December

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6760b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6774b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6850b_103CR.jpg" />

Photography by Daniel Sturley.

22nd December

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6961b_103CR_002.jpg" />

Photography by Daniel Sturley.

24th December

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20CR%20PB%20LoB%2024122021%20(1).jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20CR%20PB%20LoB%2024122021%20(2).jpg" />

27th December

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Nine%20Ladies%20Vic%20Sq%2027122021.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Equinox%20103%20Colmore%20Row%2027122021%20(1).jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Equinox%20103%20Colmore%20Row%2027122021%20(2).jpg" />

Photography by Elliott Brown.

Contained as part of this feature and accessible in the gallery are over 1,600 photos of the construction of 103 Colmore Row. Alternatively connect via 103 Colmore Row Full Construction Photo Gallery.

Share  Connect with us
50 passion points
Construction & regeneration
13 Aug 2021 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - August 2021

Post image

The external construction of 103 Colomore Row is essentially complete with the large covered recess on the Colmore Row side  being finalised. A large gallery of photos covering April to early August in the full article.

Related

The Construction of 103 Colmore Row - August 2021





The external construction of 103 Colomore Row is essentially complete with the large covered recess on the Colmore Row side  being finalised. A large gallery of photos covering April to early August in the full article.


17th April

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20CR%20fire%20escape%2017042021%20(1).jpg" />

Photography by Elliott Brown.

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_3998b_103CR.jpg" />

Photography by Daniel Sturley.

24th April

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/St%20George%20Vic%20Sq%2024042021%20(1).jpg" />

Photography by Elliott Brown.

29th April

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/Cent%20Sq%2029042021%20(1).jpg" />

Photography by Elliott Brown.

30th April

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_4903b_103CR.jpg" />

Photography by Daniel Sturley.

3rd May

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_5205b_103CR_002.jpg" />

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_5240b_103CR.jpg" />

Photography by Daniel Sturley.

4th May

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_5283b_103CR_002.jpg" />

Photography by Daniel Sturley.

9th May

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/Summer%20in%20the%20Sq%20Vic%20Sq%20(May%202021)%20(4).jpg" />

Photography by Elliott Brown.

16th May

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20Colmore%20Row%2016052021%20(2).jpg" />

Photography by Elliott Brown.

17th May

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_5519b_103CR.jpg" />

Photography by Daniel Sturley.

28th May

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/Cath%20Sq%20103%20CR%2028052021.jpg" />

Photography by Elliott Brown.

1st June

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/Construction%20of%20103%20Colmore%20Row%20-%20May%2031st.jpg" />

Photography by Stephen Giles.

5th June

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_7458b_103CR.jpg" />

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_7464b_103CR.jpg" />

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_7471b_103CR.jpg" />

Photography by Daniel Sturley.

9th June

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20Colmore%20Row%2009062021%20(1).jpg" />

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20Colmore%20Row%2009062021%20(2).jpg" />

Photography by Elliott Brown.

12th June

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_7653b_103CR.jpg" />

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/WM%20Cycle%20Hire%20Town%20Hall%20TS%2012062021%20(2).jpg" />

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/Town%20Hall%20TS%20103%20CR%2012062021%20(1).jpg" />

Photography by Elliott Brown.

13th June

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20CR%20BTT%20Bullring%2013062021.JPG" />

Photography by Elliott Brown.

21st June

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20Colmore%20Row%2021062021%20(1).jpg" />

Photography by Elliott Brown.

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_0424b_103CR.jpg" />

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_0431b_103CR.jpg" />

Photography by Daniel Sturley.

29th June

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20Colmore%20Row%20Highgate%2029062021.jpg" />

Photography by Elliott Brown.

30th June

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20Colmore%20Row%20AAE%2030062021.jpg" />

Photography by Elliott Brown.

10th July

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/The%20Alex%20103%20Col%20Row%20(Jul%202021).jpg" />

Photography by Elliott Brown.

14th July

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20CR%20LoB%20Chln%20Gdns%2014072021.jpg" />

Photography by Elliott Brown.

19th July

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20Col%20Row%2019072021.JPG" />

Photography by Elliott Brown.

20th July

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/THCP%20103%20CR%20SSQ%2020072021.jpg" />

Photography by Elliott Brown.

25th July

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/Pink%20Sfridges%2025072021%20(1).jpg" />

Photography by Elliott Brown.

28th July

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_2499b_RNBW.jpg" />

Photography by Daniel Sturley.

1st August

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20CR%20Oaklands%20RG%20SY%2001082021%20(2).jpg" />

Photography by Elliott Brown.

3rd August

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_2635b_103CR_002.jpg" />

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_2639b_103CR.jpg" />Photography by Daniel Sturley.

Click: 103 Colmore Row Construction Photo Gallery for more.

Share  Connect with us
60 passion points
Construction & regeneration
10 Apr 2021 - Stephen Giles
Gallery

The Construction of 103 Colmore Row - April 2021

Post image

We have construction photos added to the gallery for this feature build covering January to April that you may not have seen! Too many to put in a post so please visit the main gallery after looking through this selection. Above is 7th April 2021 just before sunset.

Great photos from Elliott and Daniel...

Related

The Construction of 103 Colmore Row - April 2021





We have construction photos added to the gallery for this feature build covering January to April that you may not have seen! Too many to put in a post so please visit the main gallery after looking through this selection. Above is 7th April 2021 just before sunset.

Great photos from Elliott and Daniel...


Go straight to the main gallery: 103 Colmore Row Construction Photo Gallery

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3506b_103CR_002.jpg" />

103 Colmore Row from Cathedral Square (3rd January 2021). Photography by Daniel Sturley

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8283b_103CR.jpg" />

103 Colmore Row at dusk. (19th January 2021). Photography by Daniel Sturley

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/103%20CR%20Tyseley%20Station%2002022021.jpg" />

View from Tysley Station (2nd February 2021). Photography by Elliott Brown

dndimg dndsrc="https://www.itsyourbuild.com/uploadedfiles/IMG_5930b_103CR.jpg" />

The fog hides the top of 103 Colmore Row (6th February 2021). Photography by Daniel Sturley

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20CR%20Oaklands%20RG%20(Feb%202021)%20(2).jpg" />

View from Oaklands Recreation Ground. (17th February 2021). Photography by Elliott Brown

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7353b_103CR_002.jpg" />

18th March 2021, 103 Colmore Row with a rainbow.  Photography by Daniel Sturley

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20CR%20Edgb%20Cannon%20Hill%2019022021.jpg" />

View from Edgbaston (19th February 2021). Photography by Elliott Brown

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20CR%20Edg%20Res%20(Feb%202021)%20(2).jpg" />

View from Edgbaston Reservoir (24th February 2021). Photography by Elliott Brown

dndimg dndsrc="https://www.birminghamweare.com/uploadedfiles/IMG_9245b_103CR.jpg" />

7th March 2021, 103 Colmore Row from Suffolk Street Queensway near the Mailbox.  Photography by Daniel Sturley

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0567b_103CR.jpg" />

16th March 2021, 103 Colmore Row from Victoria Square.  Photography by Daniel Sturley

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_1732b_103CR.jpg" />

22nd March 2021, 103 Colmore Row at sunset.  Photography by Daniel Sturley

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_2185b_103CR.jpg" />

26th March 2021, Installation of the bolcony parapet glass.  Photography by Daniel Sturley

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_2793b_103CR.jpg" />

1st April 2021, 103 Colmore Row from Victoria Square.  Photography by Daniel Sturley

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3196b_103CR.jpg" />

7th April 2021, 103 Colmore Row just before sunset.  Photography by Daniel Sturley

Click: 103 Colmore Row Construction Photo Gallery for more.

Share  Connect with us
40 passion points
Construction & regeneration
23 Dec 2020 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - December 2020

Post image

The finished 103 Colmore Row looks oustanding and almost surreal, as if computer generated!

A fantastic gallery of December photos in this update from Elliott and Daniel.

Related

The Construction of 103 Colmore Row - December 2020





The finished 103 Colmore Row looks oustanding and almost surreal, as if computer generated!

A fantastic gallery of December photos in this update from Elliott and Daniel.


23rd November 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_9925b_103CR.jpg" />

Photo by Daniel Sturley

4th December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20crane%2004122020%20(2).jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20crane%2004122020%20(3).jpg" />

Photos by Elliott Brown

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0659b_103CR.jpg" />

Photo by Daniel Sturley

5th December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0794b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0841b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0853b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0887b_103CR.jpg" />

Photos by Daniel Sturley

6th December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20crane%20down%2006122020%20(3).jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20crane%20down%2006122020%20(1).jpg" />

7th December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%2007122020%20(1).JPG" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%2007122020%20(2).jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%2007122020%20(4).JPG" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20crane%20down%2008122020.JPG" />

11th December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Seagull%20103%20Colmore%20Row%2011122020%20(2).jpg" />

Photos by Elliott Brown

12th December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_1259b_103CR.jpg" />

14th December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_1263b_103CR.jpg" />

Photos by Daniel Sturley

19th December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20BT%20New%20St%20Stn%2019122020.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Cent%20Sq%2019122020%20(2).jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Cent%20Sq%2019122020%20(4).jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Vic%20Sq%20Council%20House%20103%20Colmore%2019122020.jpg" />

Photos by Elliott Brown

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_1536b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_1576b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_1581b_103CR_002.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_1605b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_1675b_103CR.jpg" />

Photos by Daniel Sturley

21st December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Shortest%20day%20Cathedral%20Sq%20103%2021122020.jpg" />

Photo by Elliott Brown

22nd December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Bham%20Cathedral%2022122020.jpg" />

Photo by Elliott Brown

There are now over 1300 photos of the construction of this building and can be seen in reverse date order in the full gallery here: 103 Colmore Row Full Construction Gallery

Share  Connect with us
80 passion points
Construction & regeneration
03 Dec 2020 - Daniel Sturley
News & Updates

Birmingham's 103 Colmore Row is now externally completed!

Post image

103 Colmore Row is now externally completed with the last few panels installed on 26th November. The building is stunning and looks so different from different angles and in various lighting conditions. Take the full article for construction photos up to December 1st.

Related

Birmingham's 103 Colmore Row is now externally completed!





103 Colmore Row is now externally completed with the last few panels installed on 26th November. The building is stunning and looks so different from different angles and in various lighting conditions. Take the full article for construction photos up to December 1st.


15th November 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8507b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8533b_103CR.jpg" />

Photos by Daniel Sturley

16th November 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%2016112020%20(2).jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%2016112020%20(1).jpg" />

Photos by Elliott Brown

20th November 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_9088b_103CR.jpg" />

22nd November 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_9513b_103CR.jpg" />

23rd November 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_9764b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_9786b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_9822b_103CR.jpg" />

Photos by Daniel Sturley

26th November 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%2026112020%20(1).jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%2026112020%20(2).jpg" />

Photos by Elliott Brown

26th November 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0156b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0174b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0207b_103CR.jpg" />

Photos by Daniel Sturley

30th November 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%2030112020.JPG" />

Photo by Elliott Brown

1st December 2020

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0360b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0386b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0479b_103CR_002.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0490b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0568b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_0609b_103CR.jpg" />

Photos by Daniel Sturley

See the full gallery with many more photos not highlighted in this update:

https://www.itsyourbuild.com/kms/dmart.aspx?strTab=ProjectTimeline&PageType=item&filter_ViewArticle=N&filter_ViewPosts=N&filter_ViewGallery=Y&filter_SurveyId=105543#Content

Share  Connect with us
90 passion points
Construction & regeneration
16 Nov 2020 - Stephen Giles
Gallery

Construction of 103 Colmore Row - October & November 2020 photo update

Post image

103 Colmore Row is certainly looking superb!

Take our October & November update feature from Daniel and Reiss, contributors at It’s Your Build and Birmingham We Are, and loyal followers of the built environment in Birmingham.

Related

Construction of 103 Colmore Row - October & November 2020 photo update





103 Colmore Row is certainly looking superb!

Take our October & November update feature from Daniel and Reiss, contributors at It’s Your Build and Birmingham We Are, and loyal followers of the built environment in Birmingham.


dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50583765431_e3f67beda4_h.jpg" />

NOVEMBER

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8035b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8085b_103CR_002.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7028b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6921b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6907b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6842b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6745b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6232b_103CR_002.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6460b_103CR.jpg" />

Photos by Daniel Sturley

dndimg alt="" dndsrc="../uploadedfiles/103(1).jpg" style="width: 100%;" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50583025113_204ff219f8_h.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50583764906_e7f1d3207f_h.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50583765431_e3f67beda4_h.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50570506712_de18730746_h.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50570506482_be9db3077b_h.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50570371626_c368af65da_h.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50569623958_6d73319dc6_b.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50570370361_5646809091_b.jpg" />

Photos by Reiss Gordon-Henry.

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5939b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5866b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_4688b_SKYL_CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_4951b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5920b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5927b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5552b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6536b_SKYL.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6406b_SKYL.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6733b_VSQ.jpg" />

OCTOBER

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3656b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3641b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3816b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3799b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3844b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3967b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3976b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3961b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_4128b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_4147b_103CR_002.jpg" />

Photos by Daniel Sturley

TWITTER: Buildsweare
INSTAGRAM: Itsyourbirmingham

Share  Connect with us
60 passion points
Construction & regeneration
03 Aug 2020 - Stephen Giles
News & Updates

Construction of 103 Colmore Row - July and August 2020

Post image

The structural steelwork has officially been constructed at the top of the building, with the elegant glass facade quickly catching up, and it's looking pristine. However, the best is yet to come!

Click the post for a tremendous gallery of update photos from Daniel, Stephen, and Elliott. 

Related

Construction of 103 Colmore Row - July and August 2020





The structural steelwork has officially been constructed at the top of the building, with the elegant glass facade quickly catching up, and it's looking pristine. However, the best is yet to come!

Click the post for a tremendous gallery of update photos from Daniel, Stephen, and Elliott. 


dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50182288632.jpg" />

As the pictures show, the steelwork has reached the top floor, with the buildings stylish facade rapidly coming along.

The next phase of development will see the design & manufacturing of the glass facade (Focchi Group) for the top floor lantern restaurant, where restaurateurs will benefit from 8 metre high ceilings & breath-taking 360o views of the city. We cannot wait!

Enjoy the update.

1st August:

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50182030921_c86630bee9_o.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50182030756_4456b427f6_o.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50181491358_2962764f54_o.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50182030156_26ce19b172_o.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50181491138_244a304e28_o.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50181491238_508c13fe76_o.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50182031251_430c59e203_o.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50181490883_c547e1dcbc_o.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50181490828_32ea54878e_o.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50182288377_3c0bfb2b63_o.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50181491013_321db668a2_o.jpg" />

Photos by Stephen Giles.

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row 01082020 (3).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row 01082020 (4).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row 01082020 (6).jpg" style="width: 100%;" />

31st July:

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/Guardian Vic Sq 103 Col Row 31072020.jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/Ladywood 103 Colmore Row 31072020.jpg" style="width: 100%;" />

29th July:

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row BWA 29072020 (2).JPG" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row BWA 29072020 (4).JPG" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row BWA 29072020 (5).JPG" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row BWA 29072020 (6).JPG" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row BWA 29072020 (7).JPG" style="width: 100%;" />

25th July:

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Bennetts Hill 25072020.jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Darwin St 25072020 (1).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Darwin St 25072020 (2).jpg" style="width: 100%;" />

Photos by Elliott Brown.

24th July:

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7432b_103CR.jpg" />
 
dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7284b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7001b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7057b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7069b_103CR.jpg" />
 
dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7091b_103CR.jpg" />
 
dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7105b_103CR.jpg" />
 
dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7450b_103CR.jpg" />
 
Photos by Daniel Sturley

21st July

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Hill St 21072020.jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Margaret St 21072020.jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Newhall St 21072020 (1).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Newhall St 21072020 (2).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Great Charles St Qway 21072020.jpg" style="width: 100%;" />

Photos by Elliott Brown.

21st July:

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20-%20July%2022nd%202020%20(11).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20-%20July%2022nd%202020%20(4).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20-%20July%2022nd%202020%20(9).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20-%20July%2022nd%202020%20(3).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20-%20July%2022nd%202020%20(2).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20-%20July%2022nd%202020%20(1).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20-%20July%2022nd%202020%20(8).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20-%20July%2022nd%202020%20(7).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20-%20July%2022nd%202020%20(12).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/103%20Colmore%20Row%20-%20July%2022nd%202020%20(6).jpg" />

Photos by Stephen Giles.

18 July:

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Grand Central 18072020.jpg" style="width: 100%;" />

Photos by Elliott Brown.

 
TWITTER: @Buildsweare

Share  Connect with us
50 passion points
Construction & regeneration
17 Jul 2020 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - July 2020

Post image

103 Colmore Row is so close to structural completion now with one of the last beams being installed on 17th July. Here are various views of 103 Colmore Row in July 2020. Did you know that it is in direct line of sight of Castle Bromwich Hall? Ellliott has returned to the City Centre for the first time in over 100 days of lockdown and has got some close up views while in town. 

Related

The Construction of 103 Colmore Row - July 2020





103 Colmore Row is so close to structural completion now with one of the last beams being installed on 17th July. Here are various views of 103 Colmore Row in July 2020. Did you know that it is in direct line of sight of Castle Bromwich Hall? Ellliott has returned to the City Centre for the first time in over 100 days of lockdown and has got some close up views while in town. 


10th July 2020 from Castle Bromwich Hall Gardens

103 Colmore Row can be seen directly down the hill from Castle Bromwich Hall.

dndimg alt="Castle Bromwich" dndsrc="../uploadedfiles/103 Colmore Row Castle Bromwich (July 2020) (4).jpg" style="width: 100%;" />

dndimg alt="Castle Bromwich" dndsrc="../uploadedfiles/103 Colmore Row Castle Bromwich (July 2020) (3).jpg" style="width: 100%;" />

dndimg alt="Castle Bromwich" dndsrc="../uploadedfiles/103 Colmore Row Castle Bromwich (July 2020) (2).jpg" style="width: 100%;" />

There is also a field on Colebridge Way in Castle Bromwich which had this view (below).

dndimg alt="Castle Bromwich" dndsrc="../uploadedfiles/103 Colmore Row Castle Bromwich (July 2020) (1).jpg" style="width: 100%;" />

13th July 2020 from Cathedral Square and Colmore Row

My first time back in the City in over 100 plus days of lockdown.

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row 13072020 (1).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row 13072020 (2).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row 13072020 (3).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row 13072020 (4).jpg" style="width: 100%;" />

14th July 2020 (Bastille Day in the France) - From Centenary Way with Big Brum.

Liberté, égalité, fraternité , Vive la France. BM & AG is still closed for the foreseeable future.

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Big Brum 14072020.jpg" style="width: 100%;" />

16th July 2020 from Colmore Square

The square unusually quiet at lunchtime, with most office workers yet to go back to work. Colmore Gate was looking taller than 103 Colmore Row here. Just the odd person on a bicycle.

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row from Colmore Square 16072020.jpg" style="width: 100%;" />

Photos above by Elliott Brown.

 

17th July 2020

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6941b_103CR.jpg" />

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6954b_103CR.jpg" />

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6946b_103CR.jpg" />

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6950b_103CR.jpg" />

14th July 2020

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6837b_103CR.jpg" />

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6824b_103CR.jpg" />

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6811b_103CR.jpg" />

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6794b_103CR.jpg" />

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6772b_103CR.jpg" />

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6744b_103CR.jpg" />

8th July 2020

dndimg dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6529b_103CR.jpg" />

Photos by Daniel Sturley

Don't forget that there are many more photos of this build in the full 103 Colmore Row Gallery

Share  Connect with us
90 passion points
Construction & regeneration
30 Jun 2020 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - Late June 2020

Post image

103 Colmore Row claims to be 'Above all else', well it pretty much is now as it's on the top of the ridge above the Rea Valley where the city centre drops down towards Digbeth and Southside. The building is very close to structural top out and the cladding is being glimpsed from much further away now. Loads of photos in this post from our regular contributors...

Related

The Construction of 103 Colmore Row - Late June 2020





103 Colmore Row claims to be 'Above all else', well it pretty much is now as it's on the top of the ridge above the Rea Valley where the city centre drops down towards Digbeth and Southside. The building is very close to structural top out and the cladding is being glimpsed from much further away now. Loads of photos in this post from our regular contributors...


LATEST PICTURES FROM THE CITY CENTRE

30th June:

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6299b_130CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6322b_130CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6278b_130CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6253b_130CR.jpg" />

28th June:

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5998b_103CR.jpg" />

27th June:

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5922b_103CR.jpg" />

26th June:

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5848b_103CR_002.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5860b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5898b_103CR_002.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5904b_103CR.jpg" />

24th June:

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5787b_103CR.jpg" />

22nd June:

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5681b_103CR.jpg" />

dndimg align="middle" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_5691b_103CR.jpg" />

Photos by Daniel Sturley

26th June:

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Construction%20of%20103%20Colmore%20Row%20-%20June%2026%20(4).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Construction%20of%20103%20Colmore%20Row%20-%20June%2026%20(2).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Construction%20of%20103%20Colmore%20Row%20-%20June%2026%20(1).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50054515732_5a1311baa2_4k.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/50054270186_2bc7e676e4_5k.jpg" />Photos by Stephen Giles

But of course, you don't need to visit Birmingham City Centre to be able to capture a glimpse of the building. It's awe-inspiringly visible from the suburbs too as these pictures from Elliott Brown show.

Waseley Hills Country Park: 29th June.

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Waseley Hills CP (June 2020) (1).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Waseley Hills CP (June 2020) (2).jpg" style="width: 100%;" />

TYSELEY: 21st June.

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Mayfield Rd (June 2020).jpg" style="width: 100%;" />

TYSELEY: Mayfield Road (above) and Tyseley Station (below).

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Tyseley Station (June 2020).jpg" style="width: 100%;" />

EDGBASTON RESERVOIR: 15th June

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Edgbaston Reservoir (June 2020) (2).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Edgbaston Reservoir (June 2020) (3).jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/103 Colmore Row Edgbaston Reservoir (June 2020) (4).jpg" style="width: 100%;" />Photos by Elliott Brown

& BACK INTO THE CITY CENTRE

12th-19th June:

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/IMG_5474b_103CR.jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/IMG_5441b_103CR.jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/IMG_5371b_103CR.jpg" style="width: 100%;" />

dndimg alt="103 Colmore Row" dndsrc="../uploadedfiles/IMG_4557b_103CR.jpg" style="width: 100%;" />Photos by Daniel Sturley

Don't forget to check the regularly updated Full Gallery

 
BE SURE TO FOLLOW US ON INSTAGRAM: @ITSYOURBIRMINGHAM
and
TWITTER:

@BUILDSWEARE

Share  Connect with us
90 passion points
Construction & regeneration
11 Jun 2020 - Stephen Giles
News & Updates

The Construction of 103 Colmore Row - Our early June 2020 Update

Post image

The steel structure has now reached the top end of the core and is almost at the stage of topping out. Elsewhere, the two outer 'slabs' are now at full height.

Take our article for over 40 fantastic photos of this amazing new build.

Related

The Construction of 103 Colmore Row - Our early June 2020 Update





The steel structure has now reached the top end of the core and is almost at the stage of topping out. Elsewhere, the two outer 'slabs' are now at full height.

Take our article for over 40 fantastic photos of this amazing new build.


"Over the next two weekends (weather permitting) we bid a fond farewell to Tower Crane A. Another big milestone in the project as we enter the final 12 months of construction" - SPV

Staircase frame is reminiscent of New York's Vessel.

Here's how work has progressed throughout end May through early June.

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3836b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3842b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3843b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3822b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3827b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3349b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3428b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3434b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3441b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3447b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3460b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3462b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3465b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3469b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3477b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3500b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3518b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3542b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3548b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3558b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3586b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3605b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3611b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_2830b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3314b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3329b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_2898b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3003b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3019b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3028b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_2778b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_2784b_103CR.jpg" />

 

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3812b_103CR.jpg" />

8th june

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3779b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3793b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3795b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3593b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_3716b_103CR.jpg" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
27 Apr 2020 - Your Place Your Space
Gallery

The Construction of 103 Colmore Row - March & April (2020) update

Post image

An average of 17 glass panels a day will be fitted onto this new, 26-storey, Birmingham landmark. This update shows the progress made on site in March and April, with the structural steelwork superstructure continuing its upward rise, closely followed by the beautiful glazing facade. Already a new Birmingham Gem!

Related

The Construction of 103 Colmore Row - March & April (2020) update





An average of 17 glass panels a day will be fitted onto this new, 26-storey, Birmingham landmark. This update shows the progress made on site in March and April, with the structural steelwork superstructure continuing its upward rise, closely followed by the beautiful glazing facade. Already a new Birmingham Gem!


Gallery of 103 Colmore Row photography by Daniel Sturley, one of the People with Passion at It's Your Build and Birmingham We Are.

Photography taken during April 2020

dndimg alt="" dndsrc="../uploadedfiles/IMG_6922b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6953b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7100b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4582b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4659b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5903b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5741b_103CR.jpg" style="width: 100%;" />

Photography taken during March 2020

dndimg alt="" dndsrc="../uploadedfiles/IMG_0444b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0458b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0469b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0475b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0476b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0479b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0485b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0510b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0513b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0503b_103CR_002.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
80 passion points
Construction & regeneration
11 Feb 2020 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - February 2020

Post image

Progress at 103 Colmore Row is in a cruise state, with steel up to the 12th floor and some cladding and windows installed on the Colmore Row and Newhall Street corner, lots of great photos in this gallery from Stephen, Reiss and Daniel.

Related

The Construction of 103 Colmore Row - February 2020





Progress at 103 Colmore Row is in a cruise state, with steel up to the 12th floor and some cladding and windows installed on the Colmore Row and Newhall Street corner, lots of great photos in this gallery from Stephen, Reiss and Daniel.


dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8181b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8165b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8071b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8096b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8145b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8149b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8139b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_8132b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7954b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7826b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7858b_103CR.jpg" />

 

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7272b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7332b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7338b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7346b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7349b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7353b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7357b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7363b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7369b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7383b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7387b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7395b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7405b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7409b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_7070b_103CR.jpg" />

Photos by Daniel Sturley

 

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Construction%20of%20103%20Colmore%20Row%20-%20Feb%202020%20(2).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Construction%20of%20103%20Colmore%20Row%20-%20Feb%202020%20(4).jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/Construction%20of%20103%20Colmore%20Row%20-%20Feb%202020%20(3).jpg" />

Photos by Stephen Giles

 

dndimg alt="" dndsrc="../uploadedfiles/103 feb2020.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/6DF5A07B-1C07-4C71-A954-4B43A80E2412_1_201_a.jpeg" />

Photos by Reiss Gordon-Henry

dndimg alt="" dndsrc="http://imagizer.imageshack.us/v2/1024x768q90/924/1C7vAh.jpg" />

Artist's Impression of the finished building.

 

Share  Connect with us
30 passion points
Construction & regeneration
23 Jan 2020 - Stephen Giles
Gallery

What's happening at 103 Colmore Row - take our January 2020 update

Post image

Take this post for a superb picture update of 103 Colmore Row from Birmingham's People with Passion Daniel, Tom & Karl. Steelwork continues its upward trajectory to the ninth floor, plus an exclusive first glimpse at the glass cladding, which was delivered a week ago. Update by our follower of construction Mr Stephen Giles.

 

 

Related

What's happening at 103 Colmore Row - take our January 2020 update





Take this post for a superb picture update of 103 Colmore Row from Birmingham's People with Passion Daniel, Tom & Karl. Steelwork continues its upward trajectory to the ninth floor, plus an exclusive first glimpse at the glass cladding, which was delivered a week ago. Update by our follower of construction Mr Stephen Giles.

 

 


Work has re-commenced on site soon after the well-earned Christmas and New Year break.

Steelwork is back on the rise, now reaching levels 8 & 9, but without doubt the biggest news saw the first batch delivery of glass panels delivered on Wednesday (January 15th).

Having arrived from Italy, the panels have been designed by the Italian firm, Focchi; a specialist in window and curtain walling systems. 

This latest update shows the fantastic progress being made on site, but also shows an exclusive first glimpse of the cladding.

Enjoy!

dndimg alt="" dndsrc="../uploadedfiles/49404021588_2e386d4696_b.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/103 CR.jpg" style="width: 100%;" />

Photo by BobB1

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_20200119_093452.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_20200119_093414.jpg" />

Photos by Tom Grunt

dndimg alt="" dndsrc="../uploadedfiles/Photo 17-01-2020, 15 32 11.jpg" style="width: 100%;" />

Photo by Karl Newton

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6771b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6678b_103CR.jpg" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6072b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6077b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6083b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6604b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6647b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6637b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6666b_103CR.jpg" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6678b_103CR.jpg" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6114b_103CR_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6680b_103CR.jpg" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6129b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6135b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6154b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6157b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/uploadedfiles/IMG_6650b_103CR.jpg" />

Photos by Daniel Sturley

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Glass.jpg" style="width: 100%;" />

Photo credit to Sterling Property Ventures

Words by Stephen Giles

Share  Connect with us
60 passion points
Construction & regeneration
04 Dec 2019 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - December 2019

Post image

This build is going up so fast! These photos from the 30th November seem out of date already but it was a nice sunny day!

Related

The Construction of 103 Colmore Row - December 2019





This build is going up so fast! These photos from the 30th November seem out of date already but it was a nice sunny day!


dndimg alt="" dndsrc="../uploadedfiles/IMG_3253b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3247b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3229b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3210b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3207b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3180b_103CR_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3198b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3191b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3173b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3104b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3235b_103CR.jpg" style="width: 100%;" />

Bonus bird in this one!

Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
19 Nov 2019 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - November 2019

Post image

Here's the latest construction photo update for 103 Colmore Row with the steel structure rising fast.

Related

The Construction of 103 Colmore Row - November 2019





Here's the latest construction photo update for 103 Colmore Row with the steel structure rising fast.


dndimg alt="" dndsrc="../uploadedfiles/IMG_2767b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2765b_103CR.jpg" style="width: 100%;" />

Crane sections are massive when you see one up close!

dndimg alt="" dndsrc="../uploadedfiles/IMG_2785b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2795b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2805b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2809b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2818b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2821b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2829b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2831b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2833b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2845b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2774b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2848b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
13 Nov 2019 - Stephen Giles
Gallery

103 Colmore Row - Steel up to 4th floor! - See our Nov 2019 update

Post image

Lots more progress on the lower steel structure on this build, which has now reached the fourth floor! Take the link for a our thorough weekly picture update from Daniel, Stephen & Tom.

Related

103 Colmore Row - Steel up to 4th floor! - See our Nov 2019 update





Lots more progress on the lower steel structure on this build, which has now reached the fourth floor! Take the link for a our thorough weekly picture update from Daniel, Stephen & Tom.


dndimg alt="" dndsrc="../uploadedfiles/DSC_0010.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/DSC_0064.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/DSC_0069.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/103CR.jpg" style="width: 100%;" />

Photos by Stephen Giles

dndimg alt="" dndsrc="../uploadedfiles/IMG_20191104_190250.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_20191104_190258.jpg" style="width: 100%;" />Photos by Tom Grunt

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_2612b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2615b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2619b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2622b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2625b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2635b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2638b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2638b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2659b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2663b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2667b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2673b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2675b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2684b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2687b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2690b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2694b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
04 Nov 2019 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - November 2019

Post image

Lots more progress on the lower steel structure on this build, it is already starting to impose it's bulk on the surrounding streets and is really flying up!

Related

The Construction of 103 Colmore Row - November 2019





Lots more progress on the lower steel structure on this build, it is already starting to impose it's bulk on the surrounding streets and is really flying up!


dndimg alt="" dndsrc="../uploadedfiles/IMG_2398b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2409b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2413b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2418b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2422b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2425b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2433b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2436b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2443b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2458b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2463b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
31 Oct 2019 - Daniel Sturley
Gallery

No time for a break at 103 Colmore Row - Our end October 2019 update

Post image

Here is an end October 2019 gallery update of works at 103 Colmore. It's all go as we can see from these images taken by Daniel. 

Related

No time for a break at 103 Colmore Row - Our end October 2019 update





Here is an end October 2019 gallery update of works at 103 Colmore. It's all go as we can see from these images taken by Daniel. 


dndimg alt="" dndsrc="../uploadedfiles/IMG_20191027_093501.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_20191026_225338.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_20191027_093818.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_20191027_093817.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_20191026_195555.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_20191022_133143.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_20191022_133149.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_20191022_123453.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_20191022_123504.jpg" style="width: 100%;" />

Photos by Tom Grunt

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_1276b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1824b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1838b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1858b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1897b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1873b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1878b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1878b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1884b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1889b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1901b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1909b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1913b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1923b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1925b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
21 Oct 2019 - Stephen Giles
Gallery

The Construction of 103 Colmore Row - October 2019

Post image

Significant progress has been made on the lower steel structure for 103 Colmore Row with the vertical setbacks now clearly visible on the Newhall Street side of the build and the large overhang at street level visible on Colmore Row.

Related

The Construction of 103 Colmore Row - October 2019





Significant progress has been made on the lower steel structure for 103 Colmore Row with the vertical setbacks now clearly visible on the Newhall Street side of the build and the large overhang at street level visible on Colmore Row.


dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 1.jpg" style="width: 100%;" />Artist Impression from Doone Silver Kerr Architects

New to this update on the progress at 103 Colmore Row is the installation of four new 20 metre tall columns overlooking Colmore Row.

Weighing up to 20 tonnes, the structure will soon form the entrance to the new winter garden, the main architectural feature of the new development, as seen in the above render.

LATEST PHOTOGRAPHY TAKEN 14 - 20 OCTOBER:

dndimg alt="" dndsrc="../uploadedfiles/IMG_1386b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1396b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1420b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1399b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1410b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1372b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1358b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1347b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1337b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1334b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1331b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
30 passion points
Construction & regeneration
03 Oct 2019 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - October 2019

Post image

Some early morning shots as the sun came up in this construction photo update, the second crane has been installed this week.

Related

The Construction of 103 Colmore Row - October 2019





Some early morning shots as the sun came up in this construction photo update, the second crane has been installed this week.


dndimg alt="" dndsrc="../uploadedfiles/IMG_0473b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0445b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0436b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0423b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0418b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0405b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0519b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0497b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0363b_103CR_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0353b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0348b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0281b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0250b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0240b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0237b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0231b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
23 Sep 2019 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - September 2019 photo update

Post image

The concrete core for 103 Colmore Row is complete and construction focus will move to the lower structure, we hope we can get some photos from inside the site, nudge/wink etc.

Related

The Construction of 103 Colmore Row - September 2019 photo update





The concrete core for 103 Colmore Row is complete and construction focus will move to the lower structure, we hope we can get some photos from inside the site, nudge/wink etc.


dndimg alt="" dndsrc="../uploadedfiles/IMG_9859b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9884b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9888b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9895b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0024b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0134b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0039b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0040b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0043b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0048b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0049b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0061b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0097b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0104b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0113b_103CR_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0123b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9928b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9953b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9966b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9981b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9992b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
19 Sep 2019 - Daniel Sturley
News & Updates

The Construction of 103 Colmore Row - September 2019

Post image

Hot News! The concrete core for 103 Colmore Row appears to be complete with the slip-form being removed from the 26th floor of the mini-core. Three more photos in the full post, plus some from the last week or so, many more in the full gallery of this feature project.

Related

The Construction of 103 Colmore Row - September 2019





Hot News! The concrete core for 103 Colmore Row appears to be complete with the slip-form being removed from the 26th floor of the mini-core. Three more photos in the full post, plus some from the last week or so, many more in the full gallery of this feature project.


dndimg alt="" dndsrc="../uploadedfiles/IMG_9715b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9821b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9839b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8972b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9138b_103CR(1).jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9160b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9657b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9663b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
01 Sep 2019 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - August 2019

Post image

The core for 103 Colmore Row is at 20 floors now with the crane ties at the 12th and 19th floors. Lots of photos added in the main gallery, take the full post for a selection of 12.

Main Gallery

Related

The Construction of 103 Colmore Row - August 2019





The core for 103 Colmore Row is at 20 floors now with the crane ties at the 12th and 19th floors. Lots of photos added in the main gallery, take the full post for a selection of 12.

Main Gallery


dndimg alt="" dndsrc="../uploadedfiles/IMG_8289b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8264b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8222b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8180b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8137b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8131b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8094b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8049b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8004b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8019b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7460b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7063b_103CR.jpg" style="width: 100%;" />

Share  Connect with us
60 passion points
Construction & regeneration
29 Aug 2019 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - August 2019

Post image

Here's the latest construction photo gallery for 103 Colmore Row, this tower core is rising so fast!

Related

The Construction of 103 Colmore Row - August 2019





Here's the latest construction photo gallery for 103 Colmore Row, this tower core is rising so fast!


dndimg alt="" dndsrc="../uploadedfiles/IMG_5907b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5923b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5848b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6813b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6798b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6805b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6793b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6788b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6677b_CRN.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6634b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6700b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6615b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6585b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6582b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6559b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6686b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6503b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6545b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7662b_1CS_OUT_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7527b_1CS_OUT.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
19 Aug 2019 - Your Place Your Space
Gallery

The Construction of 103 Colmore Row, Birmingham - 18 August 2019

Post image

Such is the pace of this exciting build (now at level 17 of 26) our people with passion are contributing regularly in order to keep the community updated on developments at 103 Colmore Row. Take the article for a great gallery and construction update brought to you by It's Your Build. 

 

Related

The Construction of 103 Colmore Row, Birmingham - 18 August 2019





Such is the pace of this exciting build (now at level 17 of 26) our people with passion are contributing regularly in order to keep the community updated on developments at 103 Colmore Row. Take the article for a great gallery and construction update brought to you by It's Your Build. 

 


A wonderful collection of images from our growing band of people with passion for construction in Birmingham. 

The concrete core is now at level 17 out of 26. 

dndimg alt="" dndsrc="../uploadedfiles/IMG_4850b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5299b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4947b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6027b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6276b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5270b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6347b_103CR.jpg" style="width: 100%;" />

Photos courtesy Daniel Sturley

dndimg alt="" dndsrc="../uploadedfiles/a.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/b.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/c.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/d.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/e(1).jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/g.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/f(1).jpg" style="width: 100%;" />

Photos courtesy Alan Webb (Twitter @x_Brum)

dndimg alt="" dndsrc="../uploadedfiles/elliott(3).jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/elliott1.jpg" style="width: 100%;" />

Photos courtesy Elliott Brown

For more posts on 103 Colmore row, an interactive map of the site and to see our huge growing gallery of images, connect HERE.

Share  Connect with us
30 passion points
Construction & regeneration
05 Aug 2019 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - August 2019

Post image

103 Colmore Row has it's concrete core up to the 12th floor and the crane has been tied to it and raised, this is rising fast! Lots of photos in this update.

Related

The Construction of 103 Colmore Row - August 2019





103 Colmore Row has it's concrete core up to the 12th floor and the crane has been tied to it and raised, this is rising fast! Lots of photos in this update.


dndimg alt="" dndsrc="../uploadedfiles/IMG_3866b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3993b_103CR(1).jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4005b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4026b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4151b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4147b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4158b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4163b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4195b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4167b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4204b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4224b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4207b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4227b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4277b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4260b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4296b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4364b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4399b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4419b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4416b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4422b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4429b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4473b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4434b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4501b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4529b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
21 Jul 2019 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - July 2019

Post image

The first concrete core for 103 Colmore Row is now up to 8 floors, here's a gallery of photos including some from Victoria Square showing where the tower will rise into view.

Related

The Construction of 103 Colmore Row - July 2019





The first concrete core for 103 Colmore Row is now up to 8 floors, here's a gallery of photos including some from Victoria Square showing where the tower will rise into view.


dndimg alt="" dndsrc="../uploadedfiles/IMG_3506b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3502b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3514b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3526b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3537b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3597b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3590b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3615b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3621b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3638b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3627b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3659b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3678b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3687b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3183b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3180b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3154b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
18 Jul 2019 - Daniel Sturley
News & Updates

The Construction of 103 Colmore Row - July 2019

Post image

The first concrete core of 103 Colmore is now visable on the skyline (just) at the 8th floor, this will be one tall thin addition to the city centre!

Related

The Construction of 103 Colmore Row - July 2019





The first concrete core of 103 Colmore is now visable on the skyline (just) at the 8th floor, this will be one tall thin addition to the city centre!


dndimg alt="" dndsrc="../uploadedfiles/IMG_3077b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3085b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3109b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3091b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
50 passion points
Construction & regeneration
17 Jul 2019 - Daniel Sturley
Gallery

The Construction of 103 Colmore Row - July 2019

Post image

103 Colmore Row has the first concrete core up to the 7th floor now and will soon be visable on the skyline, we can't wait!

Related

The Construction of 103 Colmore Row - July 2019





103 Colmore Row has the first concrete core up to the 7th floor now and will soon be visable on the skyline, we can't wait!


dndimg alt="" dndsrc="../uploadedfiles/IMG_0369b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0368b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0367b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0366b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0363b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0362b_103CR.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0364b_103CR.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
07 May 2019 - Stephen Giles
News & Updates

Massive development at 103 Colmore Row in Birmingham is back on track!

Post image

The Landmark office development at 103 Colmore Row is back on track after a brief delay in construction.

Related

Massive development at 103 Colmore Row in Birmingham is back on track!





The Landmark office development at 103 Colmore Row is back on track after a brief delay in construction.


103 Colmore Row is one of a kind.

Standing at an imposing 26 storeys (108m from its lowest peak and 105.5m at its highest), it will become the city’s tallest office building once complete.

But not only that, it also takes the crown of being the largest office under construction anywhere outside of London, showing once more that Birmingham continues to be a hugely attractive city to invest and do business in.

Sterling Property Ventures and Rockspring Property Investment Managers LLP teamed up in 2014 (until the latter were acquired by Patrizia in late 2017) to bring this project forward, that is until a top London investor entered the scene recently, which saw a brief pause on construction.

Tristan Capital Partners acquired Patrizia’s interest in the site and will now work with development manager Sterling PV to commence this eagerly-awaited development.

Work has now officially recommenced with work on the concrete core set to rise this month.

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row SPV pic - April 2019.jpg" style="width: 100%;" />Photo by Sterling Property Ventures

WHAT IS IT WE'RE GETTING?

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 5.jpg" style="width: 100%;" />Artists Impression by Doone Silver Kerr

Designed by architects Doone Silver Kerr, and currently being built by BAM Construction, 103 will boast 223,631 sq ft (square foot) of office space over 20 floors, 7,665 sq ft of restaurant space on the ground and top two floors, a winter garden, 18th floor terrace and multi-purpose business lounges. 

In fact, the top two floors will see a signature double-height ‘lantern’ bar and restaraunt, offering panoramic views across the ever evolving Birmingham skyline for everyone to enjoy.

It will be lit up like a beacon at night, ensuring that this majestic building is visible from miles around the city.

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression.jpg" style="width: 100%;" />Artists Impression by Sterling Property Ventures

dndimg alt="" dndsrc="../uploadedfiles/Colmore Row (3).jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 4.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 1.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 2.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/103 Colmore Row Artist Impression 3.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/Colmore Row (4).jpg" style="width: 100%;" />Artists Impressions by Doone Silver Kerr

Share  Connect with us
60 passion points
Construction & regeneration
27 Jan 2019 - Daniel Sturley
News & Updates

103 Colmore Row, Birmingham - latest update

Post image

A peak above the hoardings of 103 Colmore Row reveals a hive of activity. This 223,631 sq.ft office tower is the largest under construction outside of London. Photo: Gtr Bham Dev.

Related

103 Colmore Row, Birmingham - latest update





A peak above the hoardings of 103 Colmore Row reveals a hive of activity. This 223,631 sq.ft office tower is the largest under construction outside of London. Photo: Gtr Bham Dev.


The building will feature restaurants on the ground & top floors, winter garden & an 18th floor terrace.

Here we have artists impressions of the final build from construction lead BAM and some photos of the demolition of the old Natwest Tower.

dndimg alt="" dndsrc="../uploadedfiles/Colmore Row (2).jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/Colmore Row (3).jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/Colmore Row (4).jpg" style="width: 100%;" />

Above images from BAM.

Share  Connect with us
60 passion points
Close and return